Quantification and Control of the Hazards Associated
with the Transport and Bulk Storage of Fireworks
CHAF

 

 

 

Deliverables


Deliverables from this project are shown in the table below, with links to more details where appropriate:

Deliverable number
Deliverable Title
Delivery Date (month)
Nature
Dissemination level
D1-1
Interim 6 month report to the European Commission
6
Re
RE
D1-2
Interim 12 month report to the European Commission
12
Re
RE
D1-3
Interim 18 month report to the European Commission
18
Re
RE
D1-4
Interim 24 month report to the European Commission
24
Re
RE
D1-5
Interim 30 month report to the European Commission
30
Re
RE
D1-6
Interim 36 month report to the European Commission
36

Re

RE
D1-7
Final project report
42

Re

RE
Final publishable report (2006)
42
 
PU
 
D2-1
Minutes of meeting of the critical review panel held in month 18
18
Re
RE
 
D3-1
Web site
4
Re
PU
D3-2
Scientific papers
36
Re
PU
 
Overview and interpretation of literature on types and compositions of fireworks articles
6
Re
PU
Overview and interpretation of literature on reaction mechanisms in and between fireworks articles
6
Re
PU
Overview and interpretation of literature on EU storage and transport regulations with regard to fireworks
6
Re
PU
Overview and interpretation of literature on environmental and health impact of fireworks
6
Re
PU
 
Quantitative overview of the information needed to be met by instrumentation
3
Re
PU
Selection of instrumentation techniques to meet the needs in other WP's
4
Me
PU
Validated set of instrumentation for all tests in the project
19
Eq
PU
 
Selection of fireworks articles for instrumented benchmarking tests
6
Da
PU
Definition of test set-up and test plan
7
Me
PU
Results from two sets of UN tests done to national methods
23
Da
PU
Guidance and recommendations for other WPs
23
Me
PU
 
A working test method for characterising the propagation of reaction between fireworks
15
Eq
PU
Flame propagation test results
18
Da
PU
Database with experimental results and an analysis of the parameters that determine the ignition and propagation of the reaction in firework articles
20
Da
PU
 
Instrumented and commissioned test cell
24
Eq
PU
Set of results as an input to the final report
36
Da
PU
 
Fireworks articles to be used in full-scale test
24
Da
PU
Detailed description of the test set up
33
Eq
PU
Test results (final report, with printing problem resolved)
39
Da
PU
Analysis of the results (final report, with printing problem resolved)
39
Re
PU
 
Selection of suitable tests with predictive power
36
Re
PU
Specification of testing conditions
42
Re
PU
Specification of instrumentation and properties to be recorded
42
Re
PU
Criteria for the evaluation of test results
42
Re
PU

* Please note that deliverables for D6-3 and D6-4 are contained in one document (PDF, 8.35MB)

Key

Nature of deliverables:

Re = Report
Da = Data Set
Eq = Equipment
Pr = Prototype
Si = Simulation
Th = Theory
De = Demonstrator
Me = Methodology
O = Other

The dissemination levels are defined as:

PU = Public
RE = Restricted to a group specified by the consortium (including the Commission Services)
CO = Confidential, only for members of the consortium (including the Commission Services)